Bloomfield 1016BVM Spezifikationen Seite 8

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 28
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 7
1016BVM OPERATION
START-UP
For initial start-up, or if the brewer has not been used for an
extended period of time:
Be sure spray disk and brew gasket are properly installed in the
brew head.
Be sure the water supply is properly connected and the water supply
valve is turned ON.
Be sure the WATER TANK IS FILLED.
IMPORTANT: Fill the water tank before energizing this unit:
Insert the brew chamber (empty) and place an EMPTY decanter in
place under the brew chamber.
Connect unit to electric power. Four beeps will sound and all lights
glow momentarily.\
Be sure the brewer is “off” (if necessary, press ON/OFF key until
no LEDs are lit).
Press BREW key three (3) times, then press CANCEL key once.
BREW and HEAT indicators will ash while tank is lling.
When water starts to ow from the brew chamber, the tank is full.
Press ON/OFF key once to terminate ll. Heating element will be
energized and will begin heating water in preparation for the rst
brew. When the water has reached the proper temperature, the
HEAT light will go out.
A.
1.
2.
3.
4.
5.
IMPORTANT:
Tank must be full of water
before pressing POWER
key “on”. Heating
elements will be damaged
if allowed to operate
without being fully
submerged in water.
Damage caused by
operating the brewer
without water in the tank
is NOT COVERED BY
WARRANTY.
6
Fig. 3 Brewer Operation Diagram
To Fill Tank, Press
BREW—BREW—BREW—CANCEL
.
912 p/n 2M-75936 Owners Manual 1016BVM Coffee Brewer
912 p/n 2M-75936 Owners Manual 1016BVM Coffee Brewer
Seitenansicht 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 27 28

Kommentare zu diesen Handbüchern

Keine Kommentare